DELTEK ACUMEN 360 TRAINING

ACUMEN 360 FOR PROJECT MANAGER

I need to be able to understand the output results as applied to my projects including basic schedule or cost quality and performance.
I need to be confident in my data and project status, therefore I need accurate information for costs, resources and delivery dates for all of my projects and reports. I also need to understand the important inputs to produce reliable output text and graphic results reports.

ACUMEN 360 FOR PROJECT CONTROLS (SCHEDULER)

I am the primary point of contact for all detail entry into the schedule or schedule status.
I am responsible for ensuring that a high fidelity schedule is in place.
I work cooperatively with the Project Controls Schedule Analyst or the CAM (Cost/Control Account Manager).
I handle change requests, model the change from a schedule standpoint, and provide input to cost as the schedule changes.
I need to get an understanding of integration points, between schedule and cost, during the proposal phase, for contract modifications or change requests, and for performance against baselines.

ACUMEN 360 FOR PROJECT CONTROLS (CAM)

I am responsible for the cost estimate quality and completeness.
I need to manage the cost baseline, evaluate changes between cost estimate versions, and provide status information to produce cost reports.
I need to be able to project confidence levels that the budgeted time-phased Performance Measurement Baseline concurs with the project funding profile.
I also need to understand where/how the schedule drives costs.

ACUMEN 360 FOR COST ESTIMATOR

I am the primary point of contact for all detail entry into the cost baseline or cost status.
I am responsible for ensuring that a high fidelity cost estimate is in place.
I work cooperatively with the Project Controls Cost Analyst or the CAM (Cost/Control Account Manager).
I handle change requests and model the change from a cost standpoint.
I need to get an understanding of integration points, between schedule and cost, during the proposal phase, for contract modifications or change requests, and for performance against baselines.

ACUMEN 360 FOR CLAIMS ANALYST

I am responsible for identifying and evaluating version changes for schedule or cost.
I need to identify when the changes happened, who initiated the change, and if the change follows the change control process (approved/not).
I also need to be able to identify the value of the change to determine responsibility in a court hearing or case.